Yokogawa HFR-3HC

3" ANSI / DN80 Alloy C-276

Open Market / 45 Days

Yokogawa AXF100C-AA2

ANSI Class 300 Wafer

Open Market / 45 Days

Yokogawa AXF300C-A

Lightning Protector

Open Market / 45 Days

Yokogawa AXF300C-AA1

ANSI Class 150 Wafer

Open Market / 45 Days

Yokogawa HFR-2HC

2" ANSI / DN50 Alloy C-276

Open Market / 45 Days

Yokogawa HFR-P22HC

Dual 1/4" NPT Flush Port Plug Alloy C-276

Open Market / 45 Days

Yokogawa AXF300C-B

Standard

Open Market / 45 Days

Yokogawa EJX630A-C3

Output signal limits: 3.8 mA to 20.5 mA Output status at CPU failure and...

Open Market / 45 Days

Yokogawa EJX110B-N1

Right side high pressure. Without drain and vent plugs.

Open Market / 45 Days

Yokogawa EJX110B-SS27

IECEx Intrinsically safe approval

Open Market / 45 Days

Yokogawa EJX110B-U1

Long vent

Open Market / 45 Days

Yokogawa EJX110B-X2

High anti-corrosion coating

Open Market / 45 Days

Yokogawa EJX115A

Differential Pressure Low Flow Transmitter (GS 01C31K01-01EN)

Open Market / 45 Days

Yokogawa EJX115A-B

304 SST 2-inch pipe mounting (flat type)

Open Market / 45 Days

Yokogawa EJX115A-C

1/2 NPT female, two electrical connections with a 316 SST blind plug

Open Market / 45 Days

Yokogawa EJX438B-T51

Pressure test/leak test certificate Test pressure:2 MPa (290 psi)

Open Market / 45 Days

Yokogawa EJX438B-M2W

Material certificate:flange, block

Open Market / 45 Days

Yokogawa AQ6151B-FCC

FC/PC (AQ9441 Connector Adapter)

Open Market / 45 Days

Yokogawa AQ6151B-SCC

SC/PC (AQ9441 Connector Adapter)

Open Market / 45 Days

Yokogawa AQ6151B-SW

Single-wavelength type

Open Market / 45 Days

Yokogawa AXF025C-RB

Rotated Converter or Terminal Box 180 degrees

Open Market / 45 Days

Yokogawa AXF025C-RC

Rotated Converter or Terminal Box -90 degrees

Open Market / 45 Days

Yokogawa AXF025C-T

Tantalum

Open Market / 45 Days

Yokogawa AXF025C-W

Tungsten Carbide

Open Market / 45 Days

Yokogawa AXF025C-X1

Epoxy Resin Coating

Open Market / 45 Days

Yokogawa AXF025G-C3

NAMUR NE43 Output limits:3.8 to 20.5 mA Output status at CPU failure/hardware...

Open Market / 45 Days

Yokogawa HTH4-B

Silicone 704 (Vacuum)+50 to 640 Deg F

Open Market / 45 Days

Yokogawa HTH4-FHC

Alloy C-276 Female NPT

Open Market / 45 Days

Yokogawa RCU31FH-0

Standard process fluid temperature range integral: -50 to 150C (-58 to 302 F)...

Open Market / 45 Days

Yokogawa HTH4-P12HC

Single 1/4" NPT Flush Port Plug Alloy C-276

Open Market / 45 Days

Yokogawa 1W-2-061-34-004

Insertion rod RF20H 2.4602 / Alloy C22 (EXtract 810)

Open Market / 45 Days

Yokogawa 1W-2-086-34-001

Set blind plug G1/8" 2.4602/C22 for cleaning chamber

Open Market / 45 Days

Yokogawa AFS20-C02

Cable 2.0 M = 6' 7 inch

Open Market / 45 Days

Yokogawa RCU31FH-C52

Net Oil Computing following API standard

Open Market / 45 Days

Yokogawa RCET38S-P15

ASME B31.3 NORM FLU. SER ASME B31.3 compliance NORMAL FLUID SERVICE

Open Market / 45 Days

Yokogawa AXF025C-M01

Material Certificate

Open Market / 45 Days

Yokogawa AXF025C-N

Open Market / 45 Days

Yokogawa AFS20-C10

Cable 10.0 M = 32' 7 inch

Open Market / 45 Days

Yokogawa AFS20-C20

Cable 20.0 M =65'2 inch

Open Market / 45 Days

Yokogawa AFD20-SG

pH - Heavy Duty Hi-Temperature Glass; 25-130C, Bellomatic Ref. with Ceramic...

Open Market / 45 Days

Yokogawa AFD20-SL

ORP Electrode (PLATINUM),0-130C Gel- Filled Ref.; Teflon Junction; 0-80C...

Open Market / 45 Days

Yokogawa AFD20-SN

Combination pH Measuring Glass, Ref. and temperature;15 - 130C; Includes...

Open Market / 45 Days

Yokogawa RCNP50S-P16

ASME B31.3 Cat M FLU. SER ASME B31.3 compliance Category M FLUID SERVICE

Open Market / 45 Days

Yokogawa AC4-C

1/4" Copper Tubing and Brass Fittings

Open Market / 45 Days

Yokogawa AXF300C-H

HASTELLOY C-276 Equivalent

Open Market / 45 Days

Yokogawa AXF300C-L

JIS SUS316L or ASTM 316L (AISI 316L SS/EN 1.4404 Equivalent)

Open Market / 45 Days

Yokogawa AXF300C-RA

Rotated Converter or Terminal Box 90 degrees

Open Market / 45 Days

Yokogawa AXF300C-RC

Rotated Converter or Terminal Box -90 degrees

Open Market / 45 Days

Yokogawa AXF300C-V

Titanium

Open Market / 45 Days

Yokogawa AXF300C-W

Tungsten Carbide

Open Market / 45 Days